Construction of N°1 by Icarai

Pen-Hir_construction_02 Boat structure assembly, 15 days after receiving the NC cut parts
Boat structure assembly, 15 days after receiving the NC cut parts
Pen-Hir_construction_04 Dressing of bulkheads : battens intended to receive accomodations are already in place
Dressing of bulkheads : battens intended to receive accomodations are already in place
Pen-Hir_construction_05 Shelves bottoms maintain the proper position of bulkheads
Shelves bottoms maintain the proper position of bulkheads
Pen-Hir_construction_06 The false stem is laminated over the backbone, and then taken apart to be fitted after planking
The false stem is laminated over the backbone, and then taken apart to be fitted after planking
Pen-Hir_construction_07 The keel fin is part of the plywood backbone
The keel fin is part of the plywood backbone
Pen-Hir_construction_01 Mortices are NC cut into the first layer of transom to fit into longitudinal bulkheads ends
Mortices are NC cut into the first layer of transom to fit into longitudinal bulkheads ends