Building Toulinguet #1

8.45 m classic cruiser
Go to Toulinguet description
DSC00371 Toulinguet under construction in center of France
Toulinguet under construction in center of France
DSC00374 The bottom planking is laid down, as well the first layer (of 3) of the side shell.
The bottom planking is laid down, as well the first layer (of 3) of the side shell.
DSC00398 The ballast keel is made of hard marine plywood. Two lead half torpedo will be tranversely bolted.
The ballast keel is made of hard marine plywood. Two lead half torpedo will be tranversely bolted.
DSC00379 The epoxy helm tube is already inserted into structure. A hole is made for the propeller shaft.
The epoxy helm tube is already inserted into structure. A hole is made for the propeller shaft.
DSC00377 The bottom planking is made of developed plywood. The side planking is cold moulded with plywood
The bottom planking is made of developed plywood. The side planking is cold moulded with plywood
DSC00402 A rabet is cut out into the bottom planking to receive the second cold moulded layer. The third layer covers the full shell.
A rabet is cut out into the bottom planking to receive the second cold moulded layer. The third layer covers the full shell.