Building Toulinguet #1

8.45 m classic cruiser
Go to Toulinguet description
DSC00371 Toulinguet under construction in center of France
Toulinguet under construction in center of France
DSC00374 The bottom planking is laid down, as well the first layer (of 3) of the side shell.
The bottom planking is laid down, as well the first layer (of 3) of the side shell.
DSC00398 The ballast keel is made of hard marine plywood. Two lead half torpedo will be tranversely bolted.
The ballast keel is made of hard marine plywood. Two lead half torpedo will be tranversely bolted.
DSC00379 The epoxy helm tube is already inserted into structure. A hole is made for the propeller shaft.
The epoxy helm tube is already inserted into structure. A hole is made for the propeller shaft.
DSC00377 The bottom planking is made of developed plywood. The side planking is cold moulded with plywood
The bottom planking is made of developed plywood. The side planking is cold moulded with plywood
DSC00402 A rabet is cut out into the bottom planking to receive the second cold moulded layer. The third layer covers the full shell.
A rabet is cut out into the bottom planking to receive the second cold moulded layer. The third layer covers the full shell.
View on the stem
The transom, with the scull notch already cut
We have overturned all inside pictures. Thus, the building frame is on top of the picture! View forward from cockpit.
The epoxy helm tube, on cockpit bottom
Bulkhead into cockpit area
View forward from main cabin
View backward. The chart table on starboard side, looking aft.
View backward. The galley on port side.
Inner view of the reinforced stringer linking bottom and side planking
Bottom structure.The ballast keel core is strongly linked to floors and structural berth sides
Bottom structure, looking aftward. The motor compartment in the background.
Fo'c'sle. Look at the stringers supporting the side planking.
Cold moulded side planking. See the stringers and the beam shelf on extreme right.
Same, looking at side
80 plywood panels are required to build Toulinguet. A large amount are already on board.
Temporary lay down of rudder
Turn-over of the hull. The builder and his wife.
The hull is now upright for completion
The galley
The chart table
General view of cockpit and cabin
The cabin
Keel and floors. Note the integrated water tank under the port side berth
The lead ballast to be bolted transversally to the keel
Making the coachroof top
2 temporary beams are fitted to support the coachroof top during lamination.
×

Cet album utilise des cookies pour mémoriser vos préférences. Il ne vous suit pas et ne stocke aucune donnée personnelle.

Ce site utilise les services externes suivants qui pourraient suivre vos visites de manière anonyme. Désactiver le suivi va arrêter leur fonctionnalité. FacebookAutoriser toutRefuser tout