Construction of Méaban #1 - 1/2

Classic sloop, 6.8 m in length,
with accomoadation for 4
Go to Meaban description
Mea1 Const A 01 Gluing laminated floors and transom.
Gluing laminated floors and transom.
Mea1 Const A 02 Transom marking from polyester patterns.
Transom marking from polyester patterns.
Mea1 Const A 03 Transom ready, including scull notch !
Transom ready, including scull notch !
Mea1 Const A 04 Marking of stem bevels from polyester patterns.
Marking of stem bevels from polyester patterns.
Mea1 Const A 05 Mast bulkhead.
Mast bulkhead.
Mea1 Const A 06 Bulkhead marking, including all attached items.
Bulkhead marking, including all attached items.